Conceptual Design and ESIA for Orom-Cross Graphite Project Waste Management Infrastructure

ClientOrom-Cross Graphite ProjectLocationUgandaYear2025
01

The challenge

The ESIA was mandated as a condition of NEMA's initial project approval to undertake the ESIA for five waste management facilities including a landfill, incinerators, and phytoremediation system.
02

Our approach

Tenvicon delivered scoping documentation, environmental baseline surveys, cultural heritage assessment, multi-stakeholder engagement, alternative analysis, and comprehensive ESIA reporting alongside conceptual design deliverables.
03

The result

Produced 2D CAD drawings, conceptual design reports, cost estimates, process flow schematics, and 3D visualisations for stakeholder presentations. Received NEMA approval CERT/1657/2025/3.